Software Project Management & Quality Assurance
This is the collection of
Sikkim Manipal University (SMU) question and answers for Software Project Management & Quality Assurance. It will help
to prepare your examination. All question paper are
classified as per semester, subject code and question type of Part A, Part B and Part C with
multiple
choice options
as same as actual examination. SMU question papers includes
year 2024, 2023, 2022 Sem I, II, III, IV, V, VI examinations
of all subjects.
SMU question test set of old,
last and previous year are updated
regularly and it is absolutely free to use. Question paper includes Visual basic 6, VB.Net, C#, ASP.Net,
Web, Oracle, Database, SQL, Software Engineering, C, C++, OOPS, MBA, MCA, BSC IT I have requested
you kindly send me the question paper of Software Project Management & Quality Assurance, SMU - Master of Computer Application.
Course Name
MCA (Master of Computer Application)
Subject Code MC0084 (Software Project Management & Quality Assurance)
Get Questions
PART - A
PART - B
PART - C
Subject : Software Project Management & Quality Assurance
MC0084 : PART - A
Q. 1 | The requirement analysis is usually done by the person called ____ |
| A) | Coding analyst |
| B) | Client analyst | | C) | Computer analyst | | D) | System analyst | | | | Q. 2 | In ____ approach, the analyst gathers information using questionnaires, brainstorming, forms, interviews, study of exciting system |
| A) | Prototyping |
| B) | Format | | C) | Conceptual modeling | | D) | Informal | | | | Q. 3 | ____ Testing consists of assuming that the logic structure of the code is unknown |
| A) | Loop Testing |
| B) | Ad hoc testing | | C) | White box testing | | D) | Black box testing | | | | Q. 4 | In software engineering the Waterfall is meant to ____ |
| A) | Coding |
| B) | Client Specification | | C) | Process | | D) | None of the above | | | | Q. 5 | The project management process is grouped into three phases called |
| A) | Planning, monitoring and control,
implementing |
| B) | Costing, monitoring and control,
implementing | | C) | Costing, Programming, control | | D) | Planning, monitoring and control,
termination | | | | Q. 6 | In industry DLOC is used to measure ____ |
| A) | Productivity |
| B) | Code | | C) | Man Hour | | D) | None of the above | | | | Q. 7 | The purpose of re-view is |
| A) | To detect the defers |
| B) | To detect Functions | | C) | To find the structure | | D) | None of the above | | | | Q. 8 | Unit testing is used to test. |
| A) | Analysis |
| B) | Design | | C) | Code | | D) | None of the above | | | | Q. 9 | ____ refers to whether appropriate software development strategic are being employed and the product is being built properly |
| A) | Validation |
| B) | Verification | | C) | Quality assurance | | D) | Simulation | | | | Q. 10 | ____ method is designed with comparative evaluation in mind and using the chosen criteria, each product is ranked in order. |
| A) | The Kepner-Tregoe |
| B) | The phased weighting factor | | C) | The cologne combination | | D) | None of the above | | | |