P2Pprogrammer 2 programmer


Home > Download > SMU - Question Paper > MCA > MC0084

Software Project Management & Quality Assurance


This is the collection of Sikkim Manipal University (SMU) question and answers for Software Project Management & Quality Assurance. It will help to prepare your examination. All question paper are classified as per semester, subject code and question type of Part A, Part B and Part C with multiple choice options as same as actual examination. SMU question papers includes year 2024, 2023, 2022 Sem I, II, III, IV, V, VI examinations of all subjects.

SMU question test set of old, last and previous year are updated regularly and it is absolutely free to use. Question paper includes Visual basic 6, VB.Net, C#, ASP.Net, Web, Oracle, Database, SQL, Software Engineering, C, C++, OOPS, MBA, MCA, BSC IT I have requested you kindly send me the question paper of Software Project Management & Quality Assurance, SMU - Master of Computer Application.

Course Name        MCA (Master of Computer Application)

Subject Code       MC0084 (Software Project Management & Quality Assurance)

Get Questions        PART - A    PART - B    PART - C

Subject : Software Project Management & Quality Assurance

     MC0084 : PART - A    


Q. 1The requirement analysis is usually done by
the person called ____
 A)Coding analyst
 B)Client analyst
 C)Computer analyst
 D)System analyst
   
Q. 2In ____ approach, the analyst gathers
information using questionnaires,
brainstorming, forms, interviews, study of
exciting system
 A)Prototyping
 B)Format
 C)Conceptual modeling
 D)Informal
   
Q. 3 ____ Testing consists of assuming that the
logic structure of the code is unknown
 A)Loop Testing
 B)Ad hoc testing
 C)White box testing
 D)Black box testing
   
Q. 4In software engineering the Waterfall is
meant to ____
 A)Coding
 B)Client Specification
 C)Process
 D)None of the above
   
Q. 5The project management process is grouped
into three phases called
 A)Planning, monitoring and control, implementing
 B)Costing, monitoring and control, implementing
 C)Costing, Programming, control
 D)Planning, monitoring and control, termination
   
Q. 6In industry DLOC is used to measure ____
 A)Productivity
 B)Code
 C)Man Hour
 D)None of the above
   
Q. 7The purpose of re-view is
 A)To detect the defers
 B)To detect Functions
 C)To find the structure
 D)None of the above
   
Q. 8Unit testing is used to test.
 A)Analysis
 B)Design
 C)Code
 D)None of the above
   
Q. 9 ____ refers to whether appropriate
software development strategic are being
employed and the product is being built
properly
 A)Validation
 B)Verification
 C)Quality assurance
 D)Simulation
   
Q. 10 ____ method is designed with comparative
evaluation in mind and using the chosen
criteria, each product is ranked in order.
 A)The Kepner-Tregoe
 B)The phased weighting factor
 C)The cologne combination
 D)None of the above
   
Click here to get Software Project Management & Quality Assurance (MC0084) New Question